How Long Does Cabinet Refacing Take? Complete Timeline Guide

Short answer: Cabinet refacing typically takes 3-5 days for an average-sized kitchen. But the full project timeline from start to finish is a bit longer. Here's what to expect at each stage.
Quick Timeline Overview
| Phase | Duration |
|---|---|
| Initial Consultation | 1-2 hours |
| Design & Material Selection | Same day or follow-up |
| Material Manufacturing/Ordering | 2-4 weeks |
| Installation | 3-5 days |
| Total Project Timeline | 3-5 weeks |
Day-by-Day Installation Breakdown
Here's what happens during the actual installation phase:
Day 1: Preparation & Door Removal
- Protect floors, countertops, and appliances
- Remove all existing cabinet doors and drawer fronts
- Remove old hardware (hinges, pulls, knobs)
- Clean and prepare cabinet boxes for veneer
- Take final measurements for any adjustments
Day 2-3: Veneer Application
- Apply matching veneer to all exposed cabinet surfaces
- Cover cabinet frames, sides, and filler pieces
- Ensure seamless color matching throughout
- Allow proper curing time between applications
Day 3-4: New Doors & Drawer Fronts
- Install new cabinet doors with proper alignment
- Mount new drawer fronts
- Install soft-close hinges (if selected)
- Adjust doors for perfect operation
Day 4-5: Hardware & Finishing
- Install new knobs and pulls
- Add crown molding or trim (if included)
- Final adjustments and alignment checks
- Thorough cleanup of work area
- Final walkthrough with homeowner
Factors That Affect Timeline
Kitchen Size
| Kitchen Size | Typical Duration |
|---|---|
| Small (10-15 doors) | 2-3 days |
| Medium (16-25 doors) | 3-4 days |
| Large (26-35 doors) | 4-5 days |
| Extra Large (35+ doors) | 5-7 days |
Other Factors
- Add-on work: Crown molding, new drawer boxes, or pull-out organizers add time
- Cabinet condition: Repairs to damaged boxes require extra attention
- Material complexity: Specialty finishes or custom elements may need more precision
- Layout complexity: Kitchens with many corners or irregular shapes take longer
Refacing vs. Replacement Timeline Comparison
| Option | Installation Time | Kitchen Usable? |
|---|---|---|
| Cabinet Refacing | 3-5 days | Yes, mostly |
| Cabinet Replacement | 4-8 weeks | No |
| Full Kitchen Remodel | 6-12 weeks | No |
Can You Use Your Kitchen During Refacing?
Yes! One of the biggest advantages of refacing is that your kitchen remains largely functional. You'll have access to your appliances and can prepare simple meals. However, plan for some inconvenience:
- Cabinet contents should be removed before work begins
- Some counter space may be limited during work hours
- Work typically runs 8am-5pm on installation days
- Consider meal prep the day before each work day
How to Prepare for Faster Installation
- Empty cabinets completely before the crew arrives
- Clear countertops of small appliances and decor
- Remove items from drawers that will get new fronts
- Ensure clear access to the kitchen work area
- Have decisions finalized before installation day
Related Articles
Want to understand costs? See our Cabinet Refacing Cost Guide for Sarasota 2024.
Not sure if refacing is right? Read Cabinet Refacing vs Replacement: Complete Guide.
Looking for style ideas? Check out Best Cabinet Styles for Florida Coastal Homes.
Service Areas
We provide fast, efficient cabinet refacing throughout Sarasota County. Visit our homepage or explore service areas: Lakewood Ranch, Siesta Key, Venice, Nokomis, and Osprey.
Ready to Schedule?
Get a free estimate and timeline for your specific kitchen.